又黄又爽无遮挡,在线欧美二区,小舞的隐私免费裸体,国产一级二级日本在线

Current position:HOME > News > Industry Dynamic

Yuba manufacturers hand to teach you Yuba installation process

Editor:Switch socket _ switch socket to join the agent _ switch socket top ten brands _ Yuba manufacturers wholesale _ Zhejiang GELAN E │ Release Time:2019-01-22 

Yuba is a must-have household appliance for winter bathing. Many people know how to use it, but they don't know how to install it. Today, Yuba manufacturers will teach you the installation process of Yuba.

浴霸安裝流程

1, open the vent


Determine the position of the ventilation holes on the wall, which should be slightly lower than the air outlet of the centrifugal fan casing above the ceiling to prevent the dew condensation water from flowing into the appliance and open a round hole at this position.


2, ceiling preparation


Note that the vacancy is left at the installation position according to the size of the opening, and the height of the sandwich space formed between the ceiling and the top of the house shall not be less than 220 mm.


3, fixed Yuba


Remove the cover, unscrew all the bulbs, disengage the spring from the ring of the mask and remove the cover.


4, wiring


One end of the interactive cord is connected to the switch panel, and the other end is pulled out from the ceiling opening together with the power cord. Open the terminal cover on the cabinet and connect the cable according to the wiring diagram and the terminal mark. Terminal block cover, screw the terminal block cover.


5, connect the ventilation pipe


Pull out the end of the air duct into the room and pull it out on the air outlet of the centrifugal fan casing.


6. Push the box into the hole


According to the position of the air outlet, select the correct direction to insert the Yuba cabinet into the hole. Use 4 wooden screws with a diameter of 4mm and a length of 20mm to fix the box on the ceiling wood.


7, the installation mask


Insert the mask positioning foot and the positioning groove of the box, and insert the spring on the corresponding loop of the mask.


8, install the bulb


Carefully screw all the bulbs into good electrical contact with the lamp holder, then wipe the bulb and mask clean.


9, fixed switch


Secure the switch to the wall to prevent the power cord from being pulled when in use.


The above points are the installation steps of the Yuba, whether it is the lamp warm bath or the air heater, for the Yuba to play the biggest role, then understanding these installation related knowledge is a must.

CONTACT

Fax:0086-573-83250880 Service Hotline:0086-573-83250886 83250887 Free Service Hotline:400-008-7727 E-mail:gelancn@126.com Address:No. 459, Qingyuan Road, Wangdian Town, Jiaxing City, Zhejiang Province
Follow us

Zhejiang GeLan Electric Co., Ltd.

在線咨詢

聯系電話

400-008-7727

<tt id="mcuuo"></tt>
<tt id="mcuuo"><acronym id="mcuuo"></acronym></tt>
<sup id="mcuuo"></sup>
<menu id="mcuuo"><tt id="mcuuo"></tt></menu> <samp id="mcuuo"><acronym id="mcuuo"></acronym></samp>
<acronym id="mcuuo"></acronym>
<acronym id="mcuuo"><optgroup id="mcuuo"></optgroup></acronym>
<object id="mcuuo"><option id="mcuuo"></option></object>
<rt id="mcuuo"><xmp id="mcuuo">
<acronym id="mcuuo"><small id="mcuuo"></small></acronym>
<rt id="mcuuo"></rt><rt id="mcuuo"></rt>
<tr id="mcuuo"><xmp id="mcuuo">
<rt id="mcuuo"></rt>
又黄又爽无遮挡 承德市| 汶上县| 贺州市| 宁乡县| 平远县| 抚顺县| 台中市| 昆山市| 庄河市| 珠海市| 偏关县| 苍溪县| 开阳县| 琼海市| 平利县| 浮梁县| 仁布县| 密山市| 安仁县| 临猗县| 砀山县| 曲靖市| 车险| 海林市| 辽宁省| 浙江省| 汽车| 阿克| 邯郸市| 广安市| 香格里拉县| 清河县| 迁西县| 阳东县| 大城县| 禹州市| 乌审旗| 中卫市| 景德镇市| 楚雄市| 阜平县| http://444 http://444 http://444